Modular manufacturing and sustainable steel: The AVA bridge

Posted on 9 Aug 2024 by Molly Cooper
At the McNealy Brown site in Sittingbourne a full-size railway footbridge looks slightly out of place. However, this is the first full prototype of the new AVA, adaptable lift and bridge system, developed by the Network Rail consortium. The Manufacturer’s Molly Cooper went to find out more about footbridge, its development and what this means…

You’ve reached your free article limit for this month. Subscribe for free to continue reading and unlock full access.